Assembly instructions

Fitting the aluminium load-securing rail on composite walls

How to glue and rivet an aluminium lashing rail, with or without pre-drilled holes, onto the composite walls of a box trailer.

Debon TrailersBox trailers (Cargo)

Safety first
  • The glue reaches full strength only after 1 week: do not put full load on the rail before then.

Before you start

Rail with pre-drilled holes
Drill through the existing holes, alternating between the upper and lower rows as shown (not all in one line).
Rail without holes
Drill the holes 150 mm apart, alternating between the upper and lower rows. Do not drill them in one straight line 200 mm apart.

At a glance

Drill bit
5 mm
Rivets
Aluminium/steel expansion rivets, 4.8 x 12 mm
Hole spacing (rail without holes)
150 mm, staggered between the upper and lower rows
Glue strength
50% after 48 hours, 100% after 1 week

Tools you need

  • Microfibre cloth
  • Isopropyl alcohol or ethyl acetate
  • Glue gun
  • Drill
  • 5 mm drill bit
  • Riveter

Drawings

Steps

0 / 4 done

  1. Clean the surfaces

    Clean the wall and the rail with a microfibre cloth and isopropyl alcohol or ethyl acetate.

  2. Glue the rail

    Apply universal glue (e.g. Mamut or Auto Weld CX-80) to the back of the rail with the glue gun, as shown. Press the rail onto the wall.

    Parts: Aluminium rail, universal glue

  3. Drill the holes

    Drill 5 mm holes through the rail and the wall in a staggered pattern. See the special cases for rails with or without holes.

  4. Rivet the rail

    Fix the rail with 4.8 x 12 mm expansion rivets. Let the glue cure for 1 week before full use.

    Parts: Rivets 4.8 x 12 mm