Assembly instructions
Fitting the aluminium load-securing rail on composite walls
How to glue and rivet an aluminium lashing rail, with or without pre-drilled holes, onto the composite walls of a box trailer.
Box trailers (Cargo)
Safety first
- The glue reaches full strength only after 1 week: do not put full load on the rail before then.
Before you start
- Rail with pre-drilled holes
- Drill through the existing holes, alternating between the upper and lower rows as shown (not all in one line).
- Rail without holes
- Drill the holes 150 mm apart, alternating between the upper and lower rows. Do not drill them in one straight line 200 mm apart.
At a glance
- Drill bit
- 5 mm
- Rivets
- Aluminium/steel expansion rivets, 4.8 x 12 mm
- Hole spacing (rail without holes)
- 150 mm, staggered between the upper and lower rows
- Glue strength
- 50% after 48 hours, 100% after 1 week
Tools you need
- Microfibre cloth
- Isopropyl alcohol or ethyl acetate
- Glue gun
- Drill
- 5 mm drill bit
- Riveter
Drawings
Steps
0 / 4 done
Clean the surfaces
Clean the wall and the rail with a microfibre cloth and isopropyl alcohol or ethyl acetate.
Glue the rail
Apply universal glue (e.g. Mamut or Auto Weld CX-80) to the back of the rail with the glue gun, as shown. Press the rail onto the wall.
Parts: Aluminium rail, universal glue
Drill the holes
Drill 5 mm holes through the rail and the wall in a staggered pattern. See the special cases for rails with or without holes.
Rivet the rail
Fix the rail with 4.8 x 12 mm expansion rivets. Let the glue cure for 1 week before full use.
Parts: Rivets 4.8 x 12 mm